1. Math
  2. Advanced Math
  3. draw a precedence diagram on engineering paper for the...

Question: draw a precedence diagram on engineering paper for the...

Question details

. Draw a Precedence Diagram on engineering paper for the list of tasks and sequence relationships below. Place the number assigned to each task description box above the activity and the duration of each activity under each task description box 2. Once your sketch is complete, use VISIO to draw a Precedence Diagram on an 1 x 17 sheet from the drawing created. eg. Demolition TASK DURATION TASKS THAT FOLLOW 2 & 3 4, 5 & 6 1. Demolition 2. Rough-in Mechanical & Electrical 3. Layout & set door Bucks 4. Tie in Mechanical&Electrical 5. Insulation 6. Partitions 7. Wiring and Controls 8. Ceiling Grid & Lighting 9. Ceramic Tiles 10. General Painting 11. Doors &Hardware 12. Test & Adjust Mechanical 13. Ceiling Tiles & Fixtures 14. Plumbing Fixtures 15. Resilient Flooring 16. Toilet Partitions & Accessories 17. Trim Paint 18. Mechanical &Electrical Fixtures 19. Clean-up&Deficiencies 12 18 10 10 8,9, 10&11 12 & 13 13 10 15 & 17 17 19 15 & 17 19 18 19
Solution by an expert tutor
Blurred Solution
This question has been solved
Subscribe to see this solution