1. Engineering
  2. Civil Engineering
  3. 2 the data below was obtained during a cbr test...

Question: 2 the data below was obtained during a cbr test...

Question details

2- The data below was obtained during a CBR test. Recall that the piston has a cross-sectional area of 3.0 in2. What is the CBR of this soil? Penetration in0.05 0.1 Piston Load (lb) 0.15 195 0.20 300 0.4 525 0.5 600 30 90 450

Solution by an expert tutor
Blurred Solution
This question has been solved
Subscribe to see this solution