1. Engineering
  2. Mechanical Engineering
  3. 2a clean room must be supplied with 800 m2hr of...

Question: 2a clean room must be supplied with 800 m2hr of...

Question details

2A clean room must be supplied with 800 m2hr of air at standard conditions. The geometry of the supply duct is shown below. Estimate the gage pressure in the clean room. Sketch the pressure distribution along the supply duct. What improvements to the duct system could you recommend? How would these improvements reduce losses? 6.2 w Patm duct hr Fon ent 0.5 Clean Room Assume duct is smooth
Solution by an expert tutor
Blurred Solution
This question has been solved
Subscribe to see this solution