1. Engineering
  2. Civil Engineering
  3. 31 the of work specifies all the work that the...

Question: 31 the of work specifies all the work that the...

Question details

31. The of work specifies all the work that the contractor needs to complete to fulfill his or her obligations to the owner. 32. An_is a change to the original contract documents prior to bids being submitted. 33. Productivity rate is labor hours divided by Excavation is measured inyards. WWF stands for 34. 35. wire fabric 36. is used to keep moisture out and divert water that has seeped into a building. 37. A is a horizontal member that supports the masonry above a wall opening. 38.flooring looks like wood but is made of four layers of materials fused together Questions 39-60, points as indicted. 39. List four variables that should be considered when estimating labor productivity (4 pts). a. b. C. d. 40. Explain how each of the following are involved in the estimate (6 pts)?

Solution by an expert tutor
Blurred Solution
This question has been solved
Subscribe to see this solution