1. Engineering
  2. Civil Engineering
  3. a gps survey and leveling were conducted to determine the...

Question: a gps survey and leveling were conducted to determine the...

Question details

A GPS Survey and leveling were conducted to determine the geoid undulation of a point. The GPS determined an elevation of 250 meters and the leveling gave an elevation of 275 meters. What is the geoid heigh?

Solution by an expert tutor
Blurred Solution
This question has been solved
Subscribe to see this solution