1. Business
  2. Operations Management
  3. assuming the overall router systems project is 750k as opposed...

Question: assuming the overall router systems project is 750k as opposed...

Question details

assuming the overall Router Systems Project is $750K (as opposed to 600K), compute the estimated costs of all the elements in the WBS (from the top level on down to the bottom work packages). Assume the same percentages as shown in Figure.

Solution by an expert tutor
Blurred Solution
This question has been solved
Subscribe to see this solution