- Business
- Operations Management
- assuming the overall router systems project is 750k as opposed...
Question: assuming the overall router systems project is 750k as opposed...
Question details
assuming the overall Router Systems Project is $750K (as
opposed to 600K), compute the estimated costs of all the elements
in the WBS (from the top level on down to the bottom work
packages). Assume the same percentages as shown in Figure.
Solution by an expert tutor
