1. Engineering
  2. Civil Engineering
  3. determine the hydrologic risk associated with a flood that occurs...

Question: determine the hydrologic risk associated with a flood that occurs...

Question details
  1. Determine the hydrologic risk associated with a flood that occurs 3 times in 100 years. The life of the project is fixed as 30 years.                                            

(Hint : A flood occurring 4 times in 100 years has 100/4 = 25 years return period)

Solution by an expert tutor
Blurred Solution
This question has been solved
Subscribe to see this solution