1. Engineering
  2. Civil Engineering
  3. figure 1 provides a schematic watershed with mean monthly observations...

Question: figure 1 provides a schematic watershed with mean monthly observations...

Question details

Figure 1 provides a schematic watershed with mean monthly observations of precipitation at 6 rain gages. Assume that the runoff ratio (the ratio of runoff to precipitation) is 0.3 for the watershed under investigation. What is the mean monthly runoff from the watershed that could be captured by your rainwater harvesting system? Calculate two different estimates using the arithmetic average, and the Thiessen method to calculate average rainfall amounts. You can calculate the area controlled by each gage by summing up the squares in the polygons. Each square has an area of 2 km2 and the numbers on the map indicate the precipitation measured at each rain gage.25 mm 28 m 19 mm 15 mm 22 mm 14 mm 10 15 20 25 30 Distance (km) Figure 1. Monthly rainfall at 6 gages

Attached will be a link with the wrong answer. Please dont do this

https://www.Zookal.com/homework-help/questions-and-answers/1-figure-1-end-document-provides-schematic-watershed-mean-monthly-observations-precipitati-q23816168

Solution by an expert tutor
Blurred Solution
This question has been solved
Subscribe to see this solution