1. Business
  2. Operations Management
  3. pa 72 a machine makes two components call a machine...

Question: pa 72 a machine makes two components call a machine...

Question details

PA 7-2 A machine makes two components, call. A machine makes two components, call them type A and B. It takes 225 seconds to switch production between the component types. During that time no production occurs. When in production, each unit of A or B requires 0.3 seconds to be completed. The two components, A and B are combined in an assembly process to make a final product, call it C. The assembly step can combine the two components into 1 unit every 1.35 seconds, or 44.44 units per minute. For questions below, Round answers to nearest whole number.) Suppose the machine rotates between one batch of 2000 units of A and 2000 per minute, where a component pair is one unit of A and one unit of B? Suppose the machine rotates between one batch of 2000 units of A and 2000 a. units of B. In that case, what is the capacity of the machine in component pairs component pairs per minute b. percent units of B. What is the utilization of the machine? Suppose the machine rotates between one batch of 2000 units of A and 2000 units units of B. What is the average inventory of B components? If the production schedule could be adjusted with the goal of minimizing switching to component B? Assume the same number of units of B would be d inventory in the process, how many units of A should be produced before units produced as well.

Solution by an expert tutor
Blurred Solution
This question has been solved
Subscribe to see this solution