1. Engineering
  2. Computer Science
  3. point which phase in the ic supply chain is considered...

Question: point which phase in the ic supply chain is considered...

Question details

point Which phase in the IC supply chain is considered trusted? Wafer probe Packaging Deploy and monitor Specification Design12. Which of the following is NOT a payload of hardware Trojan? Change ICs functionality Reduce circuit reliability Leak senstive information Remove IC designers watermark point 13. Which of the following hardware Trojan detection methods CANNOT catch non-functional Trojans? Run-time monitoring mechanisms Logic test based approaches Side channel analysis based methods point 14. Which of the following approaches is a pre-synthesis hardware Trojan prevention method? Removal of dead space Test and validation Formal verification Interface protection Shielding wires

Solution by an expert tutor
Blurred Solution
This question has been solved
Subscribe to see this solution