Problem 1 (20 points) During a particular 40-hour week of an automated production operation, 330 acceptable (non-defective) parts and 20 defective parts were produced. The operation cycle consists of a processing time of 5 min, and a part handling time of 0.40 min. Every 60 parts, a tool change is performed, and this takes 7.2 min. The machine experienced several breakdowns during the week. Determine (a) hourly production rate of acceptable parts, (b) scrap rate, and (c) availability (proportion uptime) of the machine during this week. 흐 HIBA