1. Engineering
  2. Mechanical Engineering
  3. problem 1 assume that all three of the thermal units...

Question: problem 1 assume that all three of the thermal units...

Question details

Problem 1 Assume that all three of the thermal units described below are running. Find the economic dispatch schedules using the lambda-iteration for a total demand of 900 MW. Assume the initial value of lambda as given below: ntal 7.0S/MWh Unit Data (MBtu/h н,-225 + 8.4B + 0.0025P2 | 45 Н,-7294 6.3P + 0.008 IP: | 45 H 4007.5P +0.0025P247.5 Minimum (MWMaximum (MWFuel Cost (SMBtu) 350 350 450 0.80 1.02 0.90 10 Marks

Solution by an expert tutor
Blurred Solution
This question has been solved
Subscribe to see this solution