  3. problem 3 an industrial discharge releases efluent with a concentration...

Question: problem 3 an industrial discharge releases efluent with a concentration...

Question details

Problem 3. An industrial discharge releases efluent with a concentration of 12 ug/1 at a rate of 20 gpm. A second industrial facility wishes to discharge 75 gpm with the same pollutant at a nearby point. If the river flow is 25 cfs with zero background concentration, what is the maximum effluent concentration for the second release given an allowable concentration of 0.05 μg/l in the receiving stream downstream of the discharges?
Solution by an expert tutor
Blurred Solution
This question has been solved
Subscribe to see this solution