1. Engineering
  2. Mechanical Engineering
  3. question 18 4 points save answer quotthe starting work part...

Question: question 18 4 points save answer quotthe starting work part...

Question details

Question 18 4 points Save Answer The starting work part costs $2.45 in a batch production operation. Batch quantity-100 parts. Each cycle, part handing time-o50 min, and operation t e 1.67 min. Setup time- 50 min. Equipment cost rate $35.00/hr, and labor cost rate $18.00/hr, including overhead costs. There is no tool change or tool cost in the operation. The machine tool is 100% reliable, and the scrap rate·5%, Determine the cost for each piece, after determining batch cost.
Solution by an expert tutor
Blurred Solution
This question has been solved
Subscribe to see this solution