Question 4. ABC's president has also asked you what the overall reliability of a different product (RP) is. That product has four subcomponents (SC1, SC2, SC3, and SC4). The components are organized as SC1, followed by SC2 in parallel with SC3, which are then both followed by SC4 (refer to the Question 4 Diagram). Their respective reliabilities are SC1R=.97, SC2R=.98, SC3R=.95, and SC4R=.93.
•Analyze this operations management issue.
•Provide the algebraic equation (using RP, SC1R, SC2R, SC3R, and SC4R as variables) for this analysis.
•Calculate and provide the overall product reliability given those subassemblies.

SC2 reliability .98 SCI reliability -.97 SC4 reliability .93 SC3 reliability .95