Table 1: Height information for the reservoir-pipe system

Parameter

Symbol

Value

Units

Height of dam

HDam

11

m

Height of water above middle of Pipe A

H

10

m

Height to middle of Pipe A from the datum

Z1

150

m

Height to middle of Pipe B from the datum

Z2

50

m

Height to edge of Pipe C from the datum

Z3

0

m

 

 Considering all the losses, show that head discharge relationship can be expressed by

      where   

H is the water height in the Reservoir 1 above the centreline of the Pipe A,  Z1 and  Z2 are the reference heights from the datum to the centreline of the Pipe A and B (Figure 1),  CAB is the discharge coefficient,  xAB is the composite losses and VB is velocity in Pipe B. 