Two new machines are to be located among four machines currently located in the production area the material flows expressed in thousands of units are as follow : w11=10 w12=6 ww13=0 w14=0 w22=2 w23=16 w24=8 and v12 =12 the existing machine have the following coordinates P1=(0,10)P2=(15,0)P3=(25,30)P4=(40,15)


Multi-facility ·Two new machines are to be located among four machines currently located in the p expressed in thousands of units, are as follow: w11 10, w12-6, ww13 0, w14 0, w210, w222, w2316, w24 8, and v12 = 12. the existing machine have the following coordinates: P, = (0,10), P,-(15, 0), P,-(25, 30), P+ = (40, 15). roduction area. The material flows, t is aight- sting elie 071 it- 24% . f(x1.x2) = 10(x1 )2 + 6(x 2( +802-40+12(*2) -15) +16(X2-25)2+16(-25)2 15) lc